Reekie Experience
3559 27/03/2009 Alcan Lynemouth Power Station Unit 1 HP Turbine ISM steam valve stud drilling
3547 20/03/2009 B.P. SCARV WELD TEST 10.3/4″ O/DIA PIPE 6° MACHINED GROOVES
3548 20/03/2009 Transportation costs associated with delivery of final goods or equipment to Customer
3548 20/03/2009 HYJECTOR COVER
3548 20/03/2009 HYJECTOR BODY ‘Y’ PIECE
3532 13/03/2009 MS BASE PLATE 3600 MM LONG X 1000 MM WIDE
3532 13/03/2009 FABRICATED BASE FRAME 3600 MM LONG X 1000 MM WIDE
3524 05/03/2009 WEAR PLATE CARRIERS (MK 34)
3519 04/03/2009 hire of C4 or RDG182a to cold cut 738 od x 19 wt ductile iron water main in Edinburgh
3520 04/03/2009 NUT
3520 04/03/2009 DOOR
3520 04/03/2009 BODY
3520 04/03/2009 MV Wellservicer – Chamber 1 Equipment Hatch Sealing Thread/Face Inspection
3521 04/03/2009 Eggborough 5″ 23928W valve ism bore 6.8125″ dia x 1.1/4″ length 4.3/4″ reach from top face
3517 03/03/2009 hire of 1149 insitu boring equipment
3517 03/03/2009 BRAE ‘A’ PLATFORM ROLLS-ROYCE TURBINE BEARING/HOUSING MACHINING
3510 02/03/2009 1000 ONE PIECE UPPER FRAME MEDIUM COARSE TO ROUGH 1459.75 DIA FINSH : TURN 1182 MM DIA : CHECK TAPER AND WELD IF CUSTOMER REQUIRES
3510 02/03/2009 1000 AUTOSAND / EXTRA COARSE UPPER FRAME
3507 27/02/2009 LOWER BLOCK-SHEAVE SUPPORT STRUCTURE
3507 27/02/2009 LOWER BLOCK-LOWER BLOCK ARRANGEMENT
3507 27/02/2009 AFRAME-TOP-BOOM HOIST UPPER BLOCK
3507 27/02/2009 AFRAME-AFT. LEG UPPER PART STRUCTURE
3507 27/02/2009 AFRAME-FRONT LEG STRUCTURE GENERAL ARRANGEMENT
3507 27/02/2009 AFRAME-MAIN STRUCTURE GENERAL ARRANGEMENT
3507 27/02/2009 BOOM-JIB SHAFT LAYOUT SHEAVES 2
3507 27/02/2009 BOOM-JIB SHAFT LAYOUT SHEAVES 1
3507 27/02/2009 BOOM-UPPER PART SHAFT LAYOUT SHEAVES
3507 27/02/2009 BOOM-LOWER PART SHAFT LAYOUT SHEAVES 2
3507 27/02/2009 BOOM-LOWER PART SHAFT LAYOUT SHEAVES 1
3507 27/02/2009 SLEWING PLATFORM-SHAFT LAYOUT TROLLEY SHEAVES