Reekie Experience
8836 11/07/2018 Branch (Item 1B)
8836 11/07/2018 Pipe (Item 1A)
8836 11/07/2018 Header (Item -/1A) – Drilling & Boring 2-Holes 312 Dia
8830 09/07/2018 Heater Element Removal
8831 09/07/2018 New Bearing Housing
8832 09/07/2018 Cut Only Pup Pieces 30″NB x 19.1 Wall x 520mm Lg
8832 09/07/2018 Cut Only Pup Pieces 42″NB x 28.7 Wall x 620mm Lg
8833 09/07/2018 COST FOR PALLET AND PACKAGING FINISHED COMPONENTS TO RENFREW
8833 09/07/2018 STIRRUP CAP (Mk 3)
8833 09/07/2018 HTS STIRRUP PAD
8833 09/07/2018 MS STIRRUP
8833 09/07/2018 SWIVEL SPIDER (MK 9)
8833 09/07/2018 SWIVEL PIN FOR INTERNAL LEVER COMPLETE WITH ITEMS MK 5 & 8
8833 09/07/2018 SLEEVE
8833 09/07/2018 UPPER OUTER AIR SEAL RING
8833 09/07/2018 LOWER OUTER AIR SEAL RING ITEM 1
8827 05/07/2018 Machine the top 5292 id x 6000 od face of top flange of four in number TPs
8825 04/07/2018 14 dock RAH, rail clip parallel pin removal and rail joint slitting
8817 02/07/2018 ESV Bolt Drilling
8820 02/07/2018 VISUAL INSPECTION & FUNCTIONAL TEST
RB40MCAIRBUS003
8821 02/07/2018 Drilling M42x4.5 Holes
8822 02/07/2018 LR GEAR RIB BORING
Airbus A330 Gear Rib Boring and Facing Machine
8813 25/06/2018 Transportation costs associated with delivery of final goods or equipment to Customer
8813 25/06/2018 Bottom Plate
8813 25/06/2018 Top Plate
8815 25/06/2018 Feed Well
8815 25/06/2018 Return Impeller
8815 25/06/2018 Duplex Shaft
8815 25/06/2018 Feed Impeller Ring
8815 25/06/2018 Feed Impeller