Reekie Experience
617 07/01/2004 2.1/4″ UNC STUDS
611 19/12/2003 LINER REMOVAL
612 19/12/2003 MEDIUM TOP BOLLARD
612 19/12/2003 MEDIUM BOTTOM BOLLARD
613 19/12/2003 ST ST TUBE 5″NB SCH 40 WITH 15° BEND
TO FORM VICTUALIC GROOVES
613 19/12/2003 ST ST TUBE 5″NB SCH 40 WITH 15° BEND
TO FORM VICTUALIC GROOVES
613 19/12/2003 ST ST TUBE 5″NB SCH 40 WITH 15° BEND
TO FORM VICTUALIC GROOVES
610 18/12/2003 PREPARE EQUIPMENT AS PER THE JOBPACK
608 17/12/2003 CRUACHAN PS – UNIT 1 BOTTOM COVER BOLT HOLE ENLARGING
599 10/12/2003 SHAFT LINKAGE
600 10/12/2003 TUBULAR BORING HIRE OF DL RICCI MACHINE
601 10/12/2003 Mirabella – hull – runner – deck fittings- drill and tap two sets of eight M20 holes
591 04/12/2003 STP & CDF LEAFSPRING LINISHING
587 02/12/2003 MAIN BOILER FEED PUMP MACHINING IN SAUDI
585 28/11/2003 M16 HOLE DRILLING DAYSHIFT ONLY
576 24/11/2003 ST ST TUBE 5″NB SCH 40 WITH 90° BEND 381 RAD
TO FORM VICTAULIC GROOVES
WITH 127mm TAILS
576 24/11/2003 ST ST TUBE 5″NB SCH 40 WITH 90° BEND 381 RAD
TO FORM VICTAULIC GROOVES
WITH 127mm TAILS
576 24/11/2003 ST ST TUBE 5″NB SCH 40 WITH 90° BEND 381 RAD
TO FORM VICTAULIC GROOVES
WITH 127mm TAILS
576 24/11/2003 ST ST TUBE 5″NB SCH 40 WITH 75° BEND
TO FORM VICTUALIC GROOVES
576 24/11/2003 ST ST TUBE 5″NB SCH 40 60º BENDS 381MM RAD
TO FORM VICTUALIC GROOVESWITH 127 MM TAILS
576 24/11/2003 ST ST TUBE 5″NB SCH 40 60º BENDS 381MM RAD
TO FORM VICTUALIC GROOVESWITH 127 MM TAILS
576 24/11/2003 TUBE 5″NB SCH 40 TO FORM VICTUALIC GROOVES 30° BEND, 381 RADIUS, 127mm TAILS
576 24/11/2003 TUBE 5″NB SCH 40 TO FORM VICTUALIC GROOVES 30° BEND, 381 RADIUS, 127mm TAILS
576 24/11/2003 ST ST TUBE 5″NB SCH 40 WITH 15° BEND
TO FORM VICTUALIC GROOVES
577 24/11/2003 hire of insitu facing equipment for 160 id x 190 sq 268 AC face
573 19/11/2003 CAT-330 EXCAVATOR MAIN BOOM BORING
570 18/11/2003 WELDOLETS BORING
570 18/11/2003 TUBE 220 OD X 160 ID X 515 LONG
WITH WELD OVERLAY
570 18/11/2003 STST TUBE 4″BN SCH160
MAT’L SPEC: 304H
570 18/11/2003 NOZZLE WELD PREPPING