Reekie Experience
9206 06/03/2019 Underflow Plate
9206 06/03/2019 Overflow Plate
9207 06/03/2019 Mk10 SSE Cusps & Cladding Mod No’s 740 & 741
3-off SSE to be completed consecutively
9198 28/02/2019 Machining 2 off bearing plates.
9199 28/02/2019 VISUAL INSPECTION & FUNCTIONAL TEST
RB40MCAIRBUS003
9200 28/02/2019 VISUAL INSPECTION & FUNCTIONAL TEST
RB40MCAIRBUS003
9201 28/02/2019 Insitu machining of press frame and table plate at AFRC Inchinnan and machining of table plate and slide 1 (Ram) in our works at PA4 9RL enquiry NOT complete, require further/new drawings, plan, estimate times, calculate additional costs
9195 27/02/2019 Insitu drilling of four 150 diameter holes through 125 + 125 thick plates
9196 27/02/2019 Baltic 1, dying drum No 10, hollow shaft drain side sealing face and groove
9191 21/02/2019 VISUAL INSPECTION & FUNCTIONAL TEST
RB40MCAIRBUS003
9192 21/02/2019 Baggio Staker Insitu machining 1 off damaged bearing.
9188 19/02/2019 Upperframe Re-Machine 1150
Taper
9188 19/02/2019 Upper Frame repair to tapers
9182 14/02/2019 Additonal Costs
9179 13/02/2019 Chalfont Shore Facility, Bdg 1476 Delrin Block Linishing
9172 10/02/2019 Transportation costs associated with delivery of final goods or equipment to Customer
9172 10/02/2019 36″ HLT 45TE SWL Lifting Tool
9173 10/02/2019 Rad. Door Mounting Plates (Item 1)
9174 10/02/2019 Vac. Contact Plate (Item 1 & 2)
9175 10/02/2019 PA Tube Assy. Final Machining
9168 08/02/2019 RETAINING RING
9165 07/02/2019 Pitch Yoke Surveying
9167 07/02/2019 Broken stud removal x1, restoration of existing thread x2.
9153 01/02/2019 Gasoline Surge Protection Scope – Braefoot Bay
9153 01/02/2019 Gasoline Surge Protection Scope – Braefoot Bay
9155 01/02/2019 Swivel Top Cover Boring
9150 31/01/2019 Hire of MBD and Counterbore Tooling
9148 30/01/2019 Gwynt y Mor, Phase 2 (66 Assets), 2019 Campaign, 22 Remaining Assets.Trepanning 2off Ø200 and 2 off Ø100 dia holes in each Tower
9144 29/01/2019 Dover Western Docks – Milling Sealing Faces two pairs of opposing faces 350 wide x up to 7m of 12m length
9145 29/01/2019 Offshore Rectification Work