Reekie Experience
5435 17/08/2012 ITEM 3 BEARING
5435 17/08/2012 ITEM 2 BUSH
5431 16/08/2012 Unit 2 HP turbine casing, top and bottom halves, four dowel holes, core drill/ream/bore/hone
5426 13/08/2012 Bending Machine insitu machining of 1066.8 mm id x 1200 od top face and 1066.8 diameter x 95mm long bore to clean face up flat and level and bore perpendicular to fac
5424 10/08/2012 Fragmatiser plumber block seating. Machine 2 off 850×350 welded up sections,to finish flush with original face.
5422 09/08/2012 Riser Adaptor Body 18.3/4 machining
5418 06/08/2012 Construction Foundation Turntable, machining of st/st bearing ring
5411 01/08/2012 Alcan Lochaber PS, five “new” horizontal Francis Turbine Units, bearing supports
5404 30/07/2012 Alcan Lochaber PS, five “new” horizontal Francis Turbine Units, bearing supports
5399 27/07/2012 WELDER QUALIFICATIONS TO BE DONE AT DOOSAN BABCOCK RENFREW
5399 27/07/2012 Cable Grab, machining of various bores to suit exisitng pins, total of 30 bores, 6 off bores to be machined insitu
5400 27/07/2012 PORVAIR FILTER 144 DIA
5394 25/07/2012 Lynemouth Power StationUnit 3 Boiler Feed Pump
5393 24/07/2012 RB40 Insitu Machine
Boeing A737
5390 23/07/2012 GENERAL PICKUP AND DELIVERY OF GOODS
5390 23/07/2012 NEW SERVO TOP BUSH
5390 23/07/2012 SERVO SHAFT INSPECTION
5390 23/07/2012 FINISH MACHINING OF SERVO PISTON
5390 23/07/2012 BORING & HONING OF SERVO CASING
5390 23/07/2012 SERVO BOTTOM COVER WITH BUSH
5386 19/07/2012 Airbus A320 Gear Rib Boring and Facing Machine, Design costs and Bracket Rework
5386 19/07/2012 Airbus A320 Gear Rib Boring and Facing Machine
5377 18/07/2012 Shaft machining. Machine face and radius of 9″ od, 6.41″id face, machine 6.41″ dia x 1″ long, machine 0.25″ radius with form tools
5381 18/07/2012 MOTOR C/W SHAFT ( SHAFT SWEATED ON )
5383 18/07/2012 Transportation costs associated with delivery of final goods or equipment to Customer
5383 18/07/2012 HYJECTOR COVER
5383 18/07/2012 HYJECTOR BODY ‘Y’ PIECE
5359 11/07/2012 Riffgat Contract, one monopile R16, 4700 od x 70 wt at top end, tapered at 2.282 degrees aside to 6500 od at 22580 length, 60200 mm long,
5359 11/07/2012 additional costs
5362 11/07/2012 Longannet Unit 2, S142 valve body faces,